Status
Under construction
Length
36 km
Voltage
2x66 kV
Capacity
60 MVA
COD (planned)
2023
This project starts at the Nueva Nirivilo substation, which belongs to Mataquito Transmisora de Energía (MATE), along a line to the existing Constitución substation, through a 66 kV double-circuit line. The main purpose of this project is to increase electricity transmission capacity in the national transmission system in order to enable the transmission of renewable energy.