![en-br-triangulo](https://www.celeogroup.com/wp-content/uploads/2021/09/en-br-triangulo-768x768.png)
![Linha de Transmissão Triangulo (LTT)](https://www.celeogroup.com/wp-content/uploads/2021/04/BRASIL-LTT1-700x400.jpg)
![Linha de Transmissão Triangulo (LTT)](https://www.celeogroup.com/wp-content/uploads/2021/04/BRASIL-LTT2-700x400.jpg)
![Linha de Transmissão Triangulo (LTT)](https://www.celeogroup.com/wp-content/uploads/2021/04/BRASIL-LTT3-700x400.jpg)
Status
In operation
Length
695 km
Voltage
500 kV
Capacity
1.800 MVA
COD
2008
This project involves the construction and operation of 695 km of a 500-kV transmission line. The line runs entirely within the state of Minas Gerais and connects 19 municipalities. It is designed to strengthen the national grid system in south-eastern Brazil by improving the north-south interconnector.