Status
In operation
Length
342 km
Voltage
500 kV
Capacity
-
COD
2018
The line connects the Estreito substation with the São Paulo metropolitan area. This project enables power transmission from hydropower plants in the state of Minas Gerais and the HVDC line from the large Belo Monte hydropower plant, connecting at the Estreito substation.