Status
In operation
Length
65 km
Voltage
500kV / 230 kV
Capacity
675 MVA
COD
2010
The project consists of a 65-km line connecting the two large hydroelectric power plants Barra dos Coqueiros and São Simão. This concession also includes the intermediate Itaguaçú substation with 500/230- kV transformers.