Mapa ubicación NITE

Status
Under construction

Length
36 km

Voltage
2x66 kV

Capacity
60 MVA

COD (planned)
2023

This project starts at the Nueva Nirivilo substation, which belongs to Mataquito Transmisora de Energía (MATE), along a line to the existing Constitución substation, through a 66 kV double-circuit line. The main purpose of this project is to increase electricity transmission capacity in the national transmission system in order to enable the transmission of renewable energy.