Status
Under construction
Length
240 km
Voltage
230 kV
Capacity
900 MVA
COD (estimado)
2022
This project consists of a 230-kV transmission line connecting the Oriximiná substation (Pará) with the Jurupari substation (Pará) and ultimately the Parintins substation (Amazonas). The concession includes the constructive challenge of crossing the Amazon River where it flows through the Óbidos district, with a span of 2.3 km at a height of 254 m.
This infrastructure will meet electricity demand in the districts located on both sides of the Amazon River, especially in the cities of Oriximiná, Óbidos and Juruti (Pará), and the city of Parintins (Amazonas state).