ENTERING BRAZIL

2000 - ENTERING BRAZIL

The Elecnor Group’s participation in the second transmission tender called by the Brazilian regulatory body ANEEL in 2000 led to the awarding of a project for the construction and operation of 581 km of 500 KV line, thus entering the Brazilian power transmission concession business.

Shopping Basket